A fine design company

Professional Service
Interior space & furniture layout plan
Design & furnishing consultation
Perspective drawings on carpentry works (Max 2 amendments)
Materials & colour proposal
Project management & on-site supervision
1 year warranty
Demolition Works
Remove existing floor finishes at 02 Bathrooms
Remove existing wall finishes at 02 Bathrooms
Remove existing doors at 02 Bathrooms
Remove sanitary wares & accessories at 02 Bathrooms
Uplifting of goods to premises
Disposal of renovation debris
Masonry Works
*Based On Using HDB Approved Prepacked Screed
*Based On<3.5 psf Tiles
Lay 3-step waterproofing membrance at 02 Bathrooms
*According to HDB regulations *Approved non-shrink grout as base layer
*Approved waterproofing membrance *Approved 3 in 1 waterproof screed
Lay Homogeneous floor tiles at 02 Bathrooms
Lay Homogeneous/Ceramic wall tiles at 02 Bathrooms till H2550mm
Plumbing Works
*Fittings & accessories not included
Supply and replace existing exposed cold water pipe for 2 Bathrooms
*copper/stainless steel pipe
*Additional charges of 140 for each hot point
*Additional charges of 220 if Bathrooms are separated
Install 02 sets of pedestal water closets
Install 02 sets of wash basins, complete with inlet & outlet connections
Install 02 sets of instant heaters/01 set storage heater
*Not included of heater point & wiring connection
Install 02 sets of shower mixer
Install 02 sets of hand-held bidet spray
Install Bathrooms' accessories
Miscellaneous/General Service Works
Install 02 sets Besglas bi-fold doors c/w powder coated frame & acrylic panels.
Size: L900mm x Ht2100mm
Supply and paint 02 Bathrooms ceiling with Nippon Matex White
*included oil based sealer
Supply and paint all pipes with Nippon Bodelac paint, if any
Supply & lay cardboard protection on affected flooring
Supply & lay cardboard protection for main timber door
Chemical washing
General cleaning upon completion